The following problems have been reported on Fix My Street within 2 miles of SA32 8DE:

Road breaking up right at junction, 8th April

Fri, 08 Apr 2022 00:25:59 +0100
51.810084 -4.30361

Road breaking down close to the stop line, means a loose service when pulling on to main a484
Nearest road to the pin placed on the map (automatically generated by Bing Maps): A484, Croesyceiliog
Report on FixMyStreet

The byway is overgrown and obstructed by a fence., 28th August

Fri, 28 Aug 2020 02:41:09 +0100
51.825376 -4.276976

This byway runs along a watercourse and is obstructed for much of its length. Furthermore, a barbed wire fence obstructs the carriageway where it crosses a bridge.

Nearest road to the pin placed on the map (automatically generated by Bing Maps): Llandyfaelog
Report on FixMyStreet

Conveyancing Quotes

Spending a fortune on conveyancing costs?

Compare instant, low-cost online quotes from trusted conveyancing solicitors.

Backed by experts, our no-obligation service searches through the best conveyancing quotes on the market to save you time and money.

Instant quotes
No obligation
Backed by experts
Stress free
Fully compliant
GET QUOTES NOW

Street lights not working near new nursery school, 4th November

Sun, 04 Nov 2018 09:13:54 +0000
51.816533 -4.294112

Dangerous for all !!! dark early morning & night !!! Cars and Tractors speeding in 30 mph limit on this DARK straight stretch of road !!!!!!!!
Nearest road to the pin placed on the map (automatically generated by Bing Maps): A484, Idole
Report on FixMyStreet

Noise nuisance from drain/man hole in road, 1st December

Tue, 01 Dec 2015 14:25:25 +0000
51.822671 -4.287704

Persistent noise of vehicles going over drain cover/man hole in road, which doesn't seem secure. This has been an issue for several weeks.
Nearest road to the pin placed on the map (automatically generated by Bing Maps): A484, Idole
Report on FixMyStreet

Frequent road flooding, 12th March

Mon, 12 Mar 2007 09:35:23 +0000
51.804272808906 -4.29137626697253

During periods of heavy rain, this section of road becomes completely flooded, sometimes up to as much 3 inches in depth. After pipeline construction this road needs leveling in places with proper drainage and and a new surface.
Report on FixMyStreet

51.88
-4.17