1.8MILES

M62 Westbound

3.48 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J22 and J21 | Westbound | Road Works

Location : The M62 westbound between junctions J22 and J21 . Lane Closures : Lane one will be closed. Reason : Bridge repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 1 May 2024. Lanes Closed : There will be one of three lanes closed.

2MILES

M62 Westbound

3.74 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J22 and J21 | Westbound | Road Works

Location : The M62 westbound between junctions J22 and J21 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 April 2024 to 26 April 2024. Lanes Closed : There will be one of three lanes closed.

Hotels near OL158HA

2.7MILES

M62 Westbound

1.86 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J21 westbound access | Westbound | Road Works

Location : The M62 westbound entry slip at junction J21 . Reason : Barrier repairs. Status : Currently Active. Period : expect disruption until 05:00 on 24 April 2024. Lanes Closed : All lanes are closed.

2.8MILES

M62 Eastbound

4.83 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J21 and J22 | Eastbound | Road Works

Location : The M62 eastbound between junctions J21 and J22 . Lane Closures : The hard shoulder is closed. Reason : Emergency barrier repairs. Status : Currently Active. Period : expect disruption until 23:59 on 13 August 2024.

3.7MILES

M62 Westbound

5.72 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J22 westbound exit | Westbound | Road Works

Location : The M62 westbound exit slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 28 April 2024 to 05:00 on 29 April 2024. Lanes Closed : All lanes will be closed.

Spending a fortune on conveyancing?

Conveyancing Quotes

Compare instant, low-cost online quotes from trusted conveyancing solicitors.

Backed by experts, our no-obligation service searches through the best conveyancing quotes on the market to save you time and money.

Instant quotes
No obligation
Backed by experts
Stress free
Fully compliant
GET QUOTES NOW
3.7MILES

M62 Eastbound

1.76 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J20 and J21 | Eastbound | Road Works

Location : The M62 eastbound between junctions J20 and J21 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 00:00 on 30 March 2026.

3.7MILES

M62 Westbound

1.78 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J21 and J20 | Westbound | Road Works

Location : The M62 westbound between junctions J21 and J20 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2024 to 29 June 2024. Lanes Closed : There will be two of three lanes closed.

4.3MILES

M62 Westbound

2.05 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound within J20 | Westbound | Road Works

Location : The M62 westbound at junction J20 . Lane Closures : Lane three will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 06:00 on 18 October 2024 to 06:00 on 29 October 2024. Lanes Closed : There will be one of three lanes closed.

4.3MILES

M62 Westbound

2.05 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound within J20 | Westbound | Road Works

Location : The M62 westbound at junction J20 . Lane Closures : Lanes 1 and 2 are closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 24 April 2024. Lanes Closed : There are two of three lanes closed.

4.3MILES

M62 Westbound

2.05 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound within J20 | Westbound | Road Works

Location : The M62 westbound at junction J20 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024. Lanes Closed : There will be two of three lanes closed.

4.4MILES

M62 Westbound

2.08 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound within J19 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J19 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2024 to 29 June 2024. Lanes Closed : All lanes will be closed.

4.4MILES

M62 Westbound

2.15 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J20 westbound access | Westbound | Road Works

Location : The M62 westbound entry slip at junction J20 . Lane Closures : Lane one is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 24 April 2024. Lanes Closed : There is one of two lanes closed.

4.4MILES

M62 Westbound

2.15 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J20 westbound access | Westbound | Road Works

Location : The M62 westbound entry slip at junction J20 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024. Lanes Closed : There will be one of two lanes closed.

4.4MILES

M62 Westbound

2.15 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J20 westbound access | Westbound | Road Works

Location : The M62 westbound entry slip at junction J20 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2024 to 29 June 2024. Lanes Closed : All lanes will be closed.

4.4MILES

M62 Westbound

2.15 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J20 westbound access | Westbound | Road Works

Location : The M62 westbound entry slip at junction J20 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 6 June 2024 to 06:00 on 22 June 2024. Schedule : From 06:00 on 13 July 2024 to 06:00 on 18 October 2024. Lanes Closed : There will be one of two lanes closed.

4.6MILES

M62 Eastbound

2.21 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J20 eastbound exit | Eastbound | Road Works

Location : The M62 eastbound exit slip at junction J20 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 28 April 2024 to 05:00 on 29 April 2024. Lanes Closed : There will be one of three lanes closed.

4.7MILES

M62 Westbound

2.27 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J20 and J19 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J19 . Lane Closures : Lanes 1 and 2 are closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 24 April 2024. Lanes Closed : There are two of four lanes closed.

4.7MILES

M62 Westbound

2.27 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J20 and J19 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J19 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 6 June 2024 to 06:00 on 22 June 2024. Schedule : From 06:00 on 13 July 2024 to 06:00 on 18 October 2024. Lanes Closed : There will be one of four lanes closed.

4.7MILES

M62 Westbound

2.27 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J20 and J19 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J19 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024. Lanes Closed : There will be two of four lanes closed.

4.7MILES

M62 Westbound

2.27 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J20 and J19 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J19 . Lane Closures : Lane three will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 06:00 on 18 October 2024 to 06:00 on 29 October 2024. Lanes Closed : There will be one of four lanes closed.

4.7MILES

M62 Westbound

2.27 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J20 and J19 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J19 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024. Lanes Closed : There will be one of four lanes closed.

5.4MILES

M62 Eastbound

7.24 mile of Halifax
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J22 and J23 | Eastbound | Road Works

Location : The M62 eastbound between junctions J22 and J24 . Lane Closures : Lanes 2 and 3 are closed. Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 06:00 on 24 April 2024. Lanes Closed : There are two of three lanes closed.

5.4MILES

M62 Westbound

2.87 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J19 and J18 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J18 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024. Lanes Closed : There will be two of four lanes closed.

5.4MILES

M62 Westbound

2.87 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound at the Birch services between J19 and J18 | Westbound | Road Works

Location : The M62 westbound between junctions J20 and J18 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024. Lanes Closed : There will be one of four lanes closed.

5.4MILES

M62 Eastbound

2.88 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound within J20 | Eastbound | Road Works

Location : The M62 eastbound between junctions J19 and J20 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 28 April 2024 to 05:00 on 29 April 2024. Lanes Closed : There will be one of three lanes closed.

5.4MILES

M62 Eastbound

2.88 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J19 and J20 | Eastbound | Road Works

Location : The M62 eastbound between junctions J19 and J20 . Lane Closures : Lane three will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024. Lanes Closed : There will be one of three lanes closed.

5.6MILES

M62 Eastbound

3.05 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J19 and J20 | Eastbound | Road Works

Location : The M62 eastbound between junctions J19 and J20 . Lane Closures : Lanes 1 and 2 are closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 24 April 2024. Lanes Closed : There are two of three lanes closed.

5.6MILES

M62 Eastbound

3.06 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J19 and J20 | Eastbound | Road Works

Location : The M62 eastbound between junctions J19 and J20 . Lane Closures : Lane three will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 06:00 on 13 July 2024 to 06:00 on 18 October 2024. Lanes Closed : There will be one of three lanes closed.

6MILES

M62 Westbound

3.42 mile of Rochdale
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J19 westbound exit | Westbound | Road Works

Location : The M62 westbound exit slip at junction J19 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2024 to 29 June 2024. Lanes Closed : All lanes will be closed.

6MILES

A663 Southbound

1.01 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A669 and B6189 | Southbound | Road Works

Location : The A663 southbound between the A627 and the junction with the M60 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 29 April 2024 to 06:00 on 11 May 2024.

6MILES

A663 Southbound

1.01 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound access from A627(M)/A627 | Southbound | Road Works

Location : The A663 southbound entry slip from the A627 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024. Lanes Closed : All lanes will be closed.

6.2MILES

A663 Southbound

1.04 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A627(M)/A627 and A669 | Southbound | Road Works

Location : The A663 southbound between the junctions with the A627M and the A669 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024. Lanes Closed : All lanes will be closed.

6.5MILES

A663 Southbound

1.11 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A627(M)/A627 and A669 | Southbound | Road Works

Location : The A663 southbound between the junctions with the A627M and the A669 . Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 05:00 on 24 April 2024. Lanes Closed : All lanes are closed.

6.7MILES

A663 Southbound

1.19 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A669 and B6189 | Southbound | Road Works

Location : The A663 southbound between the A627M and the junction with the M60 . Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 05:00 on 24 April 2024. Lanes Closed : All lanes are closed.

6.8MILES

A663 Northbound

1.23 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A669 and A627(M)/A627 | Northbound | Road Works

Location : The A663 northbound between the A669 and the junction with the A627M . Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 05:00 on 24 April 2024. Lanes Closed : All lanes are closed.

6.8MILES

A663 Southbound

1.22 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound within the M60 junction | Southbound | Road Works

Location : The A663 southbound between the A627M and the junction with the M60 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 24 April 2024 to 05:00 on 25 April 2024. Lanes Closed : All lanes will be closed.

6.8MILES

A663 Southbound

1.22 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A669 and B6189 | Southbound | Road Works

Location : The A663 southbound between the junctions with the A669 and the M60 . Reason : Emergency roadworks are planned. Status : Pending. Schedule : From 09:30 on 24 April 2024 to 15:30 on 24 April 2024.

6.8MILES

A663 Northbound

1.27 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A669 and A627(M)/A627 | Northbound | Road Works

Location : The A663 northbound between the M60 and the junction with the A627M . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024. Lanes Closed : All lanes will be closed.

6.8MILES

A663 Northbound

1.27 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A669 and A627(M)/A627 | Northbound | Road Works

Location : The A663 northbound between the M60 and the junction with the A627M . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024. Lanes Closed : There will be one of two lanes closed.

6.9MILES

A663 Southbound

1.32 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A669 and B6189 | Southbound | Road Works

Location : The A663 southbound between the junctions with the A669 and the M60 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.

7MILES

A663 Northbound

1.43 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A669 and A627(M)/A627 | Northbound | Road Works

Location : The A663 northbound between the M60 and the junction with the A627M . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 29 April 2024 to 06:00 on 11 May 2024.

7MILES

A663 Northbound

1.43 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between B6189 and A669 | Northbound | Road Works

Location : The A663 northbound between the junctions with the M60 and the A669 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.

7.1MILES

M62 Westbound

3.66 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound at the Birch services slip road between J19 and J18 | Westbound | Road Works

Location : The M62 westbound exit slip at Birch Services. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024. Lanes Closed : All lanes will be closed.

7.2MILES

M62 Eastbound

3.6 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound at the Birch services slip road between J18 and J19 | Eastbound | Road Works

Location : The M62 eastbound entry slip at Birch Services. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 27 April 2024 to 05:00 on 28 April 2024. Lanes Closed : All lanes will be closed.

7.5MILES

M62 Westbound

3.58 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound at the Birch services slip road between J19 and J18 | Westbound | Road Works

Location : The M62 westbound entry slip at Birch Services. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024. Lanes Closed : All lanes will be closed.

7.5MILES

M62 Eastbound

3.54 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound at the Birch services slip road between J18 and J19 | Eastbound | Road Works

Location : The M62 eastbound exit slip at Birch Services. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 27 April 2024 to 05:00 on 28 April 2024. Lanes Closed : All lanes will be closed.

7.6MILES

A663 Northbound

1.83 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between B6189 and A669 | Northbound | Road Works

Location : The A663 northbound between the junctions with the M60 and the A669 . Reason : Emergency roadworks are planned. Status : Pending. Schedule : From 09:30 on 24 April 2024 to 15:30 on 24 April 2024.

7.7MILES

M62 Eastbound

5.29 mile of Huddersfield
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J23 and J24 | Eastbound | Road Works

Location : The M62 eastbound between junctions J22 and J24 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024. Lanes Closed : There will be two of three lanes closed.

7.7MILES

A663 Northbound

1.91 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between B6189 and A669 | Northbound | Road Works

Location : The A663 northbound between the M60 and the junction with the A669 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 24 April 2024 to 05:00 on 25 April 2024. Lanes Closed : All lanes will be closed.

8.1MILES

M62 Eastbound

3.57 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound within J19 | Eastbound | Road Works

Location : The M62 eastbound between junctions J18 and J19 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 27 April 2024 to 05:00 on 28 April 2024. Lanes Closed : There will be two of four lanes closed.

8.1MILES

M60 Southbound

2.41 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M60 J21 clockwise exit | Clockwise | Road Works

Location : The M60 clockwise exit slip at junction J21 . Lane Closures : Lane one is closed. Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 05:00 on 24 April 2024. Lanes Closed : There is one of two lanes closed.

8.1MILES

A663 Southbound

2.33 mile of Oldham
4/23/2024 at 18:54
Source: Highways Agency
Congestion

A663 southbound within the M60 junction | Southbound | Congestion

Location : The A663 southbound at the junction with the M60 . Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 18:45 and 19:00 on 23 April 2024.

8.1MILES

A663 Northbound

2.35 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between M60 and B6189 | Northbound | Road Works

Location : The A663 northbound between the M60 and the junction with the A669 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 24 April 2024 to 05:00 on 25 April 2024. Lanes Closed : All lanes will be closed.

8.2MILES

M60 Northbound

2.36 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M60 J21 clockwise access | Clockwise | Road Works

Location : The M60 clockwise entry slip at junction J21 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 1 May 2024. Lanes Closed : All lanes will be closed.

8.2MILES

A663 Southbound

2.36 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 southbound between A6104 and A62 | Southbound | Road Works

Location : The A663 southbound between the M60 and the junction with the A62 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : All lanes will be closed.

8.3MILES

M60 Westbound

2.68 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M60 J21 clockwise exit | Clockwise | Road Works

Location : The M60 clockwise exit slip at junction J21 . Lane Closures : Lane two is closed. Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 05:00 on 24 April 2024. Lanes Closed : There is one of two lanes closed.

8.3MILES

M62 Westbound

4.71 mile of Huddersfield
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J23 and J22 | Westbound | Road Works

Location : The M62 westbound between junctions J24 and J22 . Lane Closures : Lane three is closed. Reason : Horticultural works. Status : Currently Active. Period : expect disruption until 06:00 on 24 April 2024. Lanes Closed : There is one of three lanes closed.

8.4MILES

A663 Northbound

2.6 mile of Oldham
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A6104 and M60 | Northbound | Road Works

Location : The A663 northbound between the junctions with the A6104 and the M60 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : All lanes will be closed.

8.5MILES

M62 Eastbound

3.7 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound between J18 and J19 | Eastbound | Road Works

Location : The M62 eastbound between junctions J18 and J19 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : There will be two of four lanes closed.

8.6MILES

A663 Northbound

2.62 mile of Manchester
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A6104 and M60 | Northbound | Road Works

Location : The A663 northbound between the junctions with the A6104 and the M60 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : All lanes will be closed.

8.6MILES

A663 Northbound

2.57 mile of Manchester
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A62 and A6104 | Northbound | Road Works

Location : The A663 northbound between the junctions with the A62 and the A6104 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024. Lanes Closed : All lanes will be closed.

8.6MILES

A663 Northbound

2.57 mile of Manchester
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

A663 northbound between A62 and A6104 | Northbound | Road Works

Location : The A663 northbound between the junctions with the A62 and the A6104 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024.

8.6MILES

M66 Southbound

2.65 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M66 southbound between J3 and M60/M62 | Southbound | Road Works

Location : The M66 southbound between junctions J3 and J4 . Lane Closures : Lane three will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : There will be one of three lanes closed.

8.8MILES

M66 Southbound

2.95 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M66 southbound between J3 and M60/M62 | Southbound | Road Works

Location : The M66 southbound between junctions J3 and J4 . Lane Closures : Lane three will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : There will be one of four lanes closed.

8.9MILES

M60 Westbound

2.95 mile of Manchester
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M60 clockwise between J19 and J20 | Clockwise | Road Works

Location : The M60 clockwise between junctions J19 and J20 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadside drains works are planned. Status : Pending. Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024. Lanes Closed : There will be two of three lanes closed.

9MILES

M60 Eastbound

2.88 mile of Manchester
4/23/2024 at 18:54
Source: Highways Agency
Congestion

M60 J19 anti-clockwise access | Anti-Clockwise | Congestion

Location : The M60 anticlockwise entry slip at junction J19 . Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 18:45 and 19:00 on 23 April 2024.

9MILES

M60 Eastbound

2.88 mile of Manchester
4/23/2024 at 18:45
Source: Highways Agency
Congestion

M60 J19 anti-clockwise access | Anti-Clockwise | Congestion

Location : The M60 anticlockwise entry slip at junction J19 . Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 18:45 and 19:00 on 23 April 2024. Delay : There are currently delays of 10 minutes against expected traffic.

9MILES

M66 Southbound

3.75 mile of Bury
4/23/2024 at 18:45
Source: Highways Agency
Congestion

M66 southbound exit for M60 | Southbound | Congestion

Location : The M66 southbound exit slip at junction J4 for M60. Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 18:45 and 19:00 on 23 April 2024.

9.1MILES

M62 Westbound

3.83 mile of Bury
4/23/2024 at 19:12
Source: Highways Agency
Congestion

M62 westbound within J18 | Westbound | Congestion

Location : The M62 westbound at junction J18 . Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 19:00 and 19:15 on 23 April 2024. Delay : There are currently delays of 10 minutes against expected traffic.

9.1MILES

M60 Eastbound

3.8 mile of Manchester
4/23/2024 at 18:54
Source: Highways Agency
Congestion

Link road from the M60 anti-clockwise to the M62 J18 roundabout | Anti-Clockwise | Congestion

Location : The M60 anticlockwise exit slip at junction J18 to roundabout. Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 18:45 and 19:00 on 23 April 2024.

9.1MILES

M60 Eastbound

3.8 mile of Manchester
4/23/2024 at 19:21
Source: Highways Agency
Congestion

Link road from the M60 anti-clockwise to the M62 J18 roundabout | Anti-Clockwise | Congestion

Location : The M60 anticlockwise exit slip at junction J18 to roundabout. Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 19:15 and 19:30 on 23 April 2024.

9.1MILES

M60 Eastbound

3.8 mile of Manchester
4/23/2024 at 17:51
Source: Highways Agency
Congestion

Link road from the M60 anti-clockwise to the M62 J18 roundabout | Anti-Clockwise | Congestion

Location : The M60 anticlockwise exit slip at junction J18 to roundabout. Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 23 April 2024.

9.1MILES

M60 Eastbound

3.8 mile of Manchester
4/23/2024 at 18:45
Source: Highways Agency
Congestion

M60 anti-clockwise within J19 | Anti-Clockwise | Congestion

Location : The M60 anticlockwise between junctions J21 and J19 . Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 19:15 and 19:30 on 23 April 2024. Delay : There are currently delays of 10 minutes against expected traffic.

9.1MILES

M60 Northbound

3.82 mile of Bury
4/23/2024 at 17:42
Source: Highways Agency
Congestion

M60 J18 clockwise exit for M62 | Clockwise | Congestion

Location : The M60 clockwise exit slip at junction J18 for M62. Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 17:30 and 17:45 on 23 April 2024. Delay : There are currently delays of 10 minutes against expected traffic.

9.2MILES

M60 Southbound

3.85 mile of Manchester
4/23/2024 at 18:18
Source: Highways Agency
Congestion

M60 J18 anti-clockwise access from M62/M66 | Anti-Clockwise | Congestion

Location : The M60 anticlockwise entry slip at junction J18 from M62/M66. Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 23 April 2024. Delay : There are currently delays of 10 minutes against expected traffic.

9.3MILES

M60 Southbound

3.85 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M60 J18 clockwise exit | Clockwise | Road Works

Location : The M60 clockwise exit slip at junction J18 for M62. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 23:00 on 23 April 2024 to 05:00 on 24 April 2024. Lanes Closed : All lanes will be closed.

9.3MILES

M62 Eastbound

3.86 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound within J18 | Eastbound | Road Works

Location : The M62 eastbound at junction J18 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 23:00 on 23 April 2024 to 05:00 on 24 April 2024. Lanes Closed : All lanes will be closed.

9.3MILES

M62 Eastbound

3.86 mile of Bury
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 eastbound within J18 | Eastbound | Road Works

Location : The M62 eastbound at junction J18 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 25 April 2024 to 05:00 on 26 April 2024. Lanes Closed : There will be two of three lanes closed.

9.4MILES

M62 Westbound

3.62 mile of Huddersfield
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 J23 westbound access | Westbound | Road Works

Location : The M62 westbound entry slip at junction J23 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 07:00 and 17:00 from 24 April 2024 to 26 April 2024.

9.7MILES

M62 Westbound

3.42 mile of Huddersfield
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound within J22 | Westbound | Road Works

Location : The M62 westbound between junctions J24 and J22 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 07:00 and 17:00 from 24 April 2024 to 26 April 2024.

9.7MILES

M60 Southbound

3.93 mile of Manchester
4/23/2024 at 19:03
Source: Highways Agency
Congestion

M60 anti-clockwise between J18 and J17 | Anti-Clockwise | Congestion

Location : The M60 anticlockwise between junctions J18 and J17 . Reason : Congestion. Status : Currently Active. Return To Normal : Normal traffic conditions are expected between 19:00 and 19:15 on 23 April 2024. Delay : There are currently delays of 10 minutes against expected traffic.

9.9MILES

M62 Westbound

3.2 mile of Huddersfield
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound within J22 | Westbound | Road Works

Location : The M62 westbound between junctions J23 and J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 20:00 on 28 April 2024 to 05:00 on 29 April 2024. Lanes Closed : All lanes will be closed.

9.9MILES

M62 Westbound

3.2 mile of Huddersfield
4/23/2024 at 22:21
Source: Highways Agency
Roadworks

M62 westbound between J24 and J23 | Westbound | Road Works

Location : The M62 westbound between junctions J24 and J23 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 07:00 and 17:00 from 24 April 2024 to 26 April 2024.

53.64
-2.1