FIXMYSTREET IN AB31 4AU
The following problems have been reported on Fix My Street within 2 miles of AB31 4AU:
1ft potholes, 22nd February
Pothole opened in last month
Report on FixMyStreet
Pothole, 23rd December
Pothole
Report on FixMyStreet
Spending a fortune on conveyancing costs?
Compare instant, low-cost online quotes from trusted conveyancing solicitors.
Backed by experts, our no-obligation service searches through the best conveyancing quotes on the market to save you time and money.
Pothole, 23rd December
Pothole
Report on FixMyStreet
Pothole, 28th October
Pothole
Report on FixMyStreet
Pothole, 8th February
Potholes x2
Report on FixMyStreet
2 x potholes, 2nd January
Potholes
Report on FixMyStreet
Potholes, 13th July
Numerous potholes opening up between Bridge of Canny and Invercanny water works.
Nearest road to the pin placed on the map (automatically generated by Bing Maps): Deeside, Banchory
Report on FixMyStreet
Pothole, 27th June
Pothole
Report on FixMyStreet
Pothole, 20th November
Pothole
Report on FixMyStreet
Pothole, 20th November
Pothole
Report on FixMyStreet
Pothole, 20th November
Pothole
Report on FixMyStreet
Pothole in road, 11th September
Pothole in road
Report on FixMyStreet
Pothole in road, 11th September
Pothole in road
Report on FixMyStreet
Pothole in road, 11th September
Pothole in road
Report on FixMyStreet
Elongate 4 foot pothole across junction, 9th December
There is a 4 foot pothole, across the junction here. I had reported this problem recently along with a number of other potholes along this road (the others of which have already been filled), it seems just this long pothole was missed.
Report on FixMyStreet
Pothole on eastern side of road, 22nd November
>14 inch pothole opening up, on the eastern side of the road, located to the north side of Marchnear driveway entrance.
Report on FixMyStreet
Two potholes opening up on the eastern edge of the road, just south of bridgend cottages., 22nd November
Two separate potholes opening up on the eastern edge of the road, located to the south of Bridgend cottages.
Report on FixMyStreet
Pothole opening up across the road, 21st November
The road has been dug up across, presumably for access to utilities. The tarmac that has been used to back fill the excavation is coming up, resulting in holes crossing nearly the entire width of the road.
Report on FixMyStreet
Building waste (concrete) has been dumped around the edge of the small pull in area, 21st November
There has been a number of incidents of fly tipping around the edges of the off road parking area. Items include old wheel barrow wheel, a large pile of now hard set concrete with glass, glass bottles. The concrete has been there since the summer, other fly tipped items appear to have been there longer.
Report on FixMyStreet
Elongate hole opening up across the junction (4 feet), 21st November
This pothole has been growing since the summer. It is parallel to the white lines going across the T junction and possibly up to 4 feet in length by now.
Report on FixMyStreet